Posts Tagged ‘dallas leed’

Geothermal HVAC | System installation

A geothermal system installation is actually quite simple. First, the wells get drilled. After they are drilled they need to settle for a while about 1-2 weeks. In our case, we drilled and let them settle for 2 weeks. We drilled a total of 12 wells – all at 250′ depth. Originally we had only

Read more