AMC#1 | Floor framing repair is completed

All the repair work in the floor framing has been completed and the entire area received new Advantech T/G subfloor decking. As soon as all the subflooring is installed we (more…)

Read more

AMC#1 | Water Damage

As suspected, the water damage at the old rear entry door is a lot more extensive than suspected. There is actually quite a bit of damage to the underlying framing (more…)

Read more

AMC#1 | Demolition begins

Yesterday we started demolition on our Southlake project. We framed and drywalled the old door openings to the main house to isolate the construction area in the back part of (more…)

Read more

AMC#1 | Demolition Plan

Studying the demolition plan you see here as well as the original framing plans,  we noticed that the way this house was originally framed, it will be fairly easy to (more…)

Read more

AMC#1 | Old bath room

Pic from the other side of the house showing the old bath room. All the plumbing fixtures will be donated to Habitat for Humanity.

Read more